Caliraya Dam
Use attributes for filter ! | |
Locations | Laguna (province) |
---|---|
Instal capac | 300 MW ; 684.6 MW (2008); Max. planned: 900 MW (Stage I); 2000 MW (Stage II) |
Construct began | Pedro Siochi |
Oper | National Power Corporation |
Catchment area | 92,000 square metres |
Coordin | 14°17′18″N 121°30′5″E / 14.28833°N 121.50139°E |
Impound | Caliraya |
Date of Reg. | |
Date of Upd. | |
ID | 4030764 |