Deriner Dam
Use attributes for filter ! | |
Height | 24900 (cm) |
---|---|
Opened | February 24, 2012 |
Construction cost | ~2 billion USD |
Annual generation | 2118 GWh |
Spillway capacity | Over-flow: 2,250 m3/s (79,000 cu ft/s); Orifice:7,000 m3/s (250,000 cu ft/s) |
Owners | State Hydraulic Works |
Date of Reg. | |
Date of Upd. | |
ID | 1108409 |
About Deriner Dam
Deriner Dam is a concrete double-curved arch dam on the Çoruh River 5 km east of Artvin in Artvin Province, Turkey. The main purpose of the dam is hydroelectric power production and additionally flood control.