Fehmarn Belt Fixed Link
Use attributes for filter ! | |
Total length | 18,000 m |
---|---|
Construction started | 2020 |
Bridge type | Bridge–tunnel |
Cross | Fehmarn Belt |
Date of Reg. | |
Date of Upd. | |
ID | 2606860 |
About Fehmarn Belt Fixed Link
The Fehmarn Belt Fixed Link is a planned immersed tunnel that is proposed to connect the Danish island of Lolland with the German island of Fehmarn, crossing the 18 km wide Fehmarn Belt in the Baltic . . .