Guri Dam photograph

Guri Dam

Use attributes for filter !
Opened 1978
Annual generation47,000 GWh
Spillway capacity27,000 m3/s (953,496 cu ft/s)
TurbinesFrancis Turbines. 10 × 725 MW; 4 × 180 MW; 3 × 400 MW; 3 × 225 MW; 1 × 340 MW
Locations Bolívar
Create Guri Reservoir
Date of Reg.
Date of Upd.
ID2308414
Send edit request

About Guri Dam


The Simón Bolívar Hydroelectric Plant, also Guri Dam, is a concrete gravity and embankment dam in Bolívar State, Venezuela on the Caroni River built from 1963 to 1969. It is 7,426 metres long and 162 m high. It impounds the large Guri Reservoir with a surface area of 4,250 square kilometres.

Related Persons

Next Profile ❯