Kığı Dam (Kığı Barajı Ve Hidroelektrik Santrali)
Use attributes for filter ! | |
Opened | 2016 |
---|---|
Surface area | 835 |
Dam volume | 23,000,000 m3 (30,082,864 cu yd) |
Owners | State Hydraulic Works |
Construction began | 1998 |
Impound | Reka Peri |
Date of Reg. | |
Date of Upd. | |
ID | 2956504 |
About Kığı Dam (Kığı Barajı Ve Hidroelektrik Santrali)
Kığı Dam is a rock-fill embankment dam on the Peri River in Bingöl Province, Turkey. Its primary purpose is hydroelectric power generation and is the first dam in the Peri River cascade, serving as the headwaters. Construction began in 1998 and is backed by the Turkish State Hydraulic Works.