Lunar Lander
Use attributes for filter ! | |
Landing date | 2018 (proposed) |
---|---|
Launch date | 2018 (proposed) |
Manufacturers | Astrium |
Mission duration | Transfer: ~2-4 months; Surface operations: several months (proposed) |
Launch mass | ~2,000 kg (4,400 lb) |
Dimensions | height: 3. 44 m (11. 3 ft); diameter: 5. 6 m (18 ft) |
Date of Reg. | |
Date of Upd. | |
ID | 2117015 |
About Lunar Lander
The Lunar Lander was a robotic mission intended to send a lander vehicle to the Moon, led by ESA's Human Spaceflight and Operations directorate. The primary objective of the Lunar Lander mission was to demonstrate Europe's ability to deliver payload safely and accurately to the Moon's surface.
US-China rivalry spurs investment in space tech
... He points to Elon Musk s SpaceX, to build a Lunar Lander, and has also developed the most powerful rocket ever built...
Chandrayaan-3: Isro puts India's Moon lander and rover in 'sleep mode'
...By Geeta PandeyBBC News, DelhiIndia s Lunar Lander and rover have been put to bed as the Sun begins to set on the Moon, the country s space research agency Isro has said...
iSpace: First private Moon landing likely to have failed
... Communication was lost with the Hakuto-R Lunar Lander moments before it was due to touch down...
Iris: Student-built robot rover on track to explore the Moon
... The robot was recently secured to its Lunar Lander, ahead of a launch scheduled for mid-2022...