Pembelik Dam
Use attributes for filter ! | |
Opened | 2015 |
---|---|
Dam volume | 838,000 m3 (1,096,000 cu yd) |
Construction began | 2009 |
Impound | Reka Peri |
Music groups | Yedisu Dam |
Hınıs Başköy Dam | |
Date of Reg. | |
Date of Upd. | |
ID | 2946350 |
About Pembelik Dam
The Pembelik Dam is a gravity dam on the Peri River, in Karakoçan district of Elazığ Province, Turkey. Its primary purpose is hydroelectric power generation and is the fourth dam in the Peri River cascade. Construction on the dam began in 2009 and its two generators were commissioned in February/March 2015.