Teles Pires Dam
Use attributes for filter ! | |
Opened | 2011 |
---|---|
Construction cost | 1. 62 billion USD (R$ 3. 3 billion) |
Owners | Brazilian Electricity Regulatory Agency |
Spillway capacity | 13,704 m3/s (483,952 cu ft/s) |
Maximum water depth | 6. 6 m (22 ft) (average) |
Construction began | July 2011 |
Date of Reg. | |
Date of Upd. | |
ID | 3046863 |
About Teles Pires Dam
The Teles Pires Dam is a run-of-the-river hydroelectric dam on the Teles Pires River, 330 km upstream of the confluence with the Tapajós river, on the border of the Brazilian states of Mato Grosso and Pará. The 80-metre dam impounds a 150-square-kilometre reservoir, 84% in Mato Grosso state and 16% in Para state.