Tocoma Dam
Use attributes for filter ! | |
Opened | 2012 |
---|---|
Surface area | 87 |
Construction began | 2006 |
Impound | Rio Caroni |
Turbines | 10 x 232 MW (311,000 hp) Kaplan-type |
Annual generation | 12,100 GWh (44,000 TJ) |
Date of Reg. | |
Date of Upd. | |
ID | 2962106 |
About Tocoma Dam
The Manuel Piar Hydroelectric Power Plant is under construction and it is the last hydroelectric development project in the Lower Caroní River Basin of Venezuela. The project includes the installation of 2,320 megawatts MW to generate an annual average energy of 12,100 gigawatt-hours.